Preparation, 6 off line equalization operation, 6off line equalization operation – GE Industrial Solutions Off Line Equalization (OLE) User Manual

Page 25

Advertising
background image

Off Line Equalization Panel and Converter for GPS4848/GPS4812

Issue 4 January 2008

Off Line Equalization Operation 6 - 1

6

Off Line Equalization Operation

Preparation

Guidelines

It is important that the battery string to be equalized be fully charged
prior to performing the equalization operation. To ensure full state of
charge, equalization should not be performed within 48 hours after a
significant discharge event.

Advertising