Preparation, 6 off line equalization operation, 6off line equalization operation – GE Industrial Solutions Off Line Equalization (OLE) User Manual
Page 25
Advertising
Off Line Equalization Panel and Converter for GPS4848/GPS4812
Issue 4 January 2008
Off Line Equalization Operation 6 - 1
6
Off Line Equalization Operation
Preparation
Guidelines
It is important that the battery string to be equalized be fully charged
prior to performing the equalization operation. To ensure full state of
charge, equalization should not be performed within 48 hours after a
significant discharge event.
Advertising