Post-installation instructions, Post-installation instructions 29 – Acer AT310 F1 User Manual

Page 47

Advertising
background image

29

4

Place the server on a flat, stable surface.

5

Open the server according to the instructions on page 36.

6

Follow the ESD precautions described in the previous section when
handling a server component.

Post-installation instructions

Perform the steps below after installing a server component.

1

See to it that all components are installed according to the
described step-by-step instructions.

2

Reinstall any expansion board(s), peripheral(s), bracket(s) and
system cable(s) that have previously been removed.

3

Reinstall the side panel.

4

Reconnect the power, peripheral, and telecommunication cables.

5

Turn on the system.

Advertising