4 initial commissioning, Initial commissioning – Xylem pHotoFlex/pHotoFlex Turb User Manual
Page 21
Advertising
pHotoFlex / pHotoFlex Turb
Commissioning
21
ba75491d04
07/2006
3.4
Initial commissioning
Perform the following activities:
! For
– accumulator operation: insert the accumulator pack (see
– line power operation and charging the accumulator pack: connect
the power pack (see section 3.2)
– operation with LabStation: connect the LabStation and place the
pHotoFlex (Turb) in the LabStation (see section 3.3)
! Switch on the meter (see section 4.1)
! Set the language as necessary (see section 4.3.3)
! Set the date and time as necessary (see section 4.3.4)
Note
When you set the language, date and time according to the mentioned
sections of this operating manual you will quickly become familiar with
the simple operation of the pHotoFlex (Turb).
Advertising