2 inserting a cell, Inserting a cell – Xylem pHotoFlex/pHotoFlex Turb User Manual

Page 24

Advertising
background image

Operation

pHotoFlex / pHotoFlex Turb

24

ba75491d04

07/2006

Display illumination

with battery and accu-

mulator pack operation

During operation with batteries or accumulator pack the meter automat-
ically switches off the display illumination if no key is pressed for
30 seconds. The illumination is switched on again with the next key-
stroke.

4.2

Inserting a cell

To be able to insert cells in the pHotoFlex (Turb), the cell shaft has to
be prepared to take in a cell.

Inserting a 28 mm cell

1

Push the dust cover (1) upward.
The cell shaft for 28 mm cells is open.
! Insert a 28 mm cell (see below)
! Insert a 16 mm cell (see page 25)

1

2

Insert the cell so that it is positioned on the bottom of the cell
shaft.

The cell is ready to be measured.

3

For turbidity measurement:

Align the cell (see section 4.7.2).

Advertising