John Wood Envirosense Power Vent User Manual

Page 24

Advertising
background image

24

B. deburring

Use a knife, plastic pipe deburring tool, or file to remove burrs from the

end of small diameter pipe. Be sure to remove all burrs from around the

inside as well as the outside of the pipe. A slight chamfer (bevel) of about

10°-15° should be added to the end to permit easier insertion of the pipe

into the end of the fitting. Failure to chamfer the edge of the pipe may

remove cement from the fitting socket, causing the joint to leak.

step B

C. Test dry fit of the joint

Tapered fitting sockets are designed so that an interfaced fit should

occur when the pipe is inserted about 1/3 to 2/3 of the way into the

socket. Occasionally, when pipe fitting dimensions are at the tolerance

extremes, it will be possible to fully insert dry pipe to the bottom of

the fitting socket. When this happens, a sufficient quantity of cement

must be applied to the joint to fill the gap between the pipe and fitting.

The gap must be filled to obtain a strong, leak-free joint.

d. Inspection, cleaning, priming

Visually inspect the inside of the pipe and fitting sockets and remove

all dirt, grease or moisture with a clean dry rag. If wiping fails to clean

the surfaces, a chemical cleaner must be used. Check for possible

damage such as splits or cracks and replace if necessary.

depth-of-entry

Marking the depth of entry is a way to check if the pipe has reached

the bottom of the fitting socket in Step F. Measure the fitting depth

and mark this distance on the pipe O.D. You may want to add

several inches to the distance and make a second mark as the

primer and cement will most likely destroy your first one.

Apply primer to the surface of the pipe and fitting socket with

a natural bristle brush. This process softens and prepares the

PVC or CPVC for the solvent cementing step. Move quickly and

without hesitation to the cementing procedure while the surfaces

are still wet with primer.

e. application of solvent cement

• Apply the solvent cement evenly and quickly around outside of the

pipe at a width a little greater than the depth of the fitting socket.

• Apply a light coat of cement evenly around the inside of the

fitting socket. Avoid puddling.

• Apply a second coat of cement to the pipe end.

step e

f. joint assembly

Working quickly, insert the pipe into the fitting socket bottom and

give the pipe or fitting a 1/4 turn to evenly distribute the cement.

Do not continue to rotate the pipe after it has hit the bottom of the

fitting socket. A good joint will have sufficient cement to make a

bead all the way around the outside of the fitting hub. The fitting

will have a tendency to slide back while the cement is still wet

so hold the joint together for about 15 seconds.

step f

G. cleanup and joint movement

Remove all excess cement from around the pipe and fitting with a

dry cotton rag. This must be done while the cement is still soft.

The joint should not be disturbed immediately after the cementing

procedure, and sufficient time should be allowed for proper curing

of the joint. Exact drying time is difficult to predict because it

depends on variables such as temperature, humidity and cement

integrity. For more specific information, you should contact your

solvent cement manufacturer.

step G

Advertising