8

7.

Installation

Securing to the wall

Clearance Requirements from Vent Terminations to Building Openings

* All clearance requirements are in accordance with ANSI Z21.10.3 and the National Fuel Gas Code,

ANSI Z223.1 and in Canada, in accordance with NSCNGPIC.

Vent Terminal

Clearance

A=

Above grade, veranda, porch, deck,
or balcony

B=

Window or door that may be opened

C=

Permanently closed window

D=

Vertical clearance to ventilated soffit
located above the terminal within a
horizontal distance of 0.6m (2') from
the center of the terminal

*

E=

Unventilated soffit

*

F=

Outside corner

*

G=

Inside corner

*

H=

Each side of center line extended
above meter/regulator assembly

0.9m (3') within a height 4.5m (15')
above meter/regulator assembly

I=

Service regulator vent outlet

0.9m (3')

J=

Nonmechanical air supply inlet or
combustion air inlet to any other
appliance

K=

Mechanical air supply inlet

L=

Above paved sidewalk or paved
driveway located on public property
Under veranda, porch, deck, or
balcony

M=

[ ]= indicates clearances required in Canada
* Maintain clearances in accordance with local installation codes and the requirements of the gas supplier
*** A vent shall not terminate directly above a sidewalk or paved driveway that is located between two
single family dwellings and serves both dwellings.
**** Permitted only if veranda,porch,deck,or balcony is fully open on a minimum of two sides beneath the floor.

*

Air Supply Inlet

Area Where Terminal
is Not Permitted

300mm (12") [300mm (12")]

300mm (12") [900mm (36")]

0.9m (3') above if within
3m (10') [1.8m (6')]

*[300mm (12") - Canada Only****]

300mm (12") [900mm (36")]

[2.1m *** (7' ***)]