Step 5: load the mms server into the rack – AMX MAX Servers User Manual

Page 70

Advertising
background image

Rack Mounting MAX Servers

64

MAX Servers: HT Home Theater and MMS Multimedia Servers

Step 4: Install the Outer Rail/Extension Racket Assemblies In the Rack

Once both of the Outer Rail/Bracket assembles (from the previous step) are prepared, they can be
installed into the rack cabinet. Follow these steps for both of the Outer Rail/Bracket assemblies:

1.

Insert the Outer Rail/Bracket assembly into the rack. Make sure that the Extension Bracket is
situated towards the rear of the rack.

2.

Attach the rear end of the Outer Rail/Bracket assembly to the rack with two screws, (securing the
Extension Bracket, Locking Plate and Outer Rail to the rear flange of the rack cabinet).

3.

Align the front of the Outer Rail/Bracket assembly to the front flange on the rack, and secure using
two screws.

Step 5: Load the MMS Server Into the Rack

Once the Outer Rail/Bracket assemblies have been installed in the rack cabinet, the MMS server can
slide into the rack, using the Inner Server Rails (already attached to the server chassis):

1.

Carefully align the front of the Outer Slide Rails (in the rack) with the Inner Server Rails (on the
MMS server chassis).

2.

Slowly slide the MMS server, into the outer slide rails. Keep the MMS parallel to the floor when
sliding the server rails into the slide rails. Tilting the server up or down could result in damage to
the slide rail assembly.

3.

Push the locking tabs in to lock into place. The MMS server slides into the rack until the Locking
Release Tabs on the Inner Server Rails engage the Outer Slide Rails.

Be careful when pressing the Inner Server Rail release latches and sliding the server into the
rack. The slide rails could pinch your fingertips.

FIG. 55

Attaching the Extension Bracket to the Outer Rail (using a Locking Plate)

Locking plate

Extension bracket

Outer Rail

Extension Bracket Feet

front

Advertising