FIG. 64 shows the Adapter Bars properly mounted to the Rack-Rail assemblies and vertical mounting
rails in the equipment rack:

Step 6: Load the HT Server Into the Rack

Once the Rail Assemblies have been installed into the equipment rack cabinet, the server can be mounted
on the rails and slid into the rack (FIG. 65):

1.

Slide the Rails (Intermediate Sections) out to their fully extended position.

2.

Carefully align the Chassis Sections (mounted on the HT server) with the extended Rails.

3.

Slide the server onto the extended rails. Keep the server parallel to the floor when sliding the server
rails into the rails. Tilting the server up or down could result in damage to the Slide Rails.

FIG. 63

Align the holes on the Adapter Bar to the holes on the rails in the equipment rack

FIG. 64

Adapter Bars mounted to the equipment rack

Adapter Bar

Mounting Rail in equipment rack

Align the center hole on the Adapter Bar to a center hole

Align the top hole on the Adapter Bar to the bottom hole

Align the bottom hole on the Adapter Bar to the top hole

of the upper-adjacent RU in the equipment rack.

in one of the RUs in the equipment rack.

of the lower-adjacent RU in the equipment rack.