Schedule - control – Contemporary Research SW-DX Manual User Manual
Page 31
Advertising
Contemporary Research
31 Display Express System Manual
Schedule - Control
The Schedule Control page launches Events by date or recurring cycle. Events are similar to Presets, but include an
assigned date, cycle, and time.
Schedule displays the list of Events by date and time.
Enabled/Disable – click to run or stop the schedule
Today’s/All Events – Displays just the events for today or all Events
Schedules – Select from a list of saved schedules
Set Current Schedule – set the selected schedule for current use
Advertising
This manual is related to the following products: