Schedule - control – Contemporary Research SW-DX Manual User Manual

Page 31

Advertising
background image

Contemporary Research

31 Display Express System Manual

Schedule - Control


The Schedule Control page launches Events by date or recurring cycle. Events are similar to Presets, but include an

assigned date, cycle, and time.

Schedule displays the list of Events by date and time.

Enabled/Disable – click to run or stop the schedule

Today’s/All Events – Displays just the events for today or all Events

Schedules – Select from a list of saved schedules

Set Current Schedule – set the selected schedule for current use


Advertising
This manual is related to the following products: