Packaged direct expansion (dx) units, Figure 1 - lockable handle, Caution – AAON RN-140 User Manual

Page 26: Warning

Advertising
background image

26

Figure 1 - Lockable Handle


The warranty card must be completed in full
and returned to AAON not more than 3
months after unit is delivered.

Storage
If installation will not occur immediately
following delivery, store equipment in a dry
protected area away from construction
traffic and in the proper orientation as
marked on the packaging with all internal
packaging in place. Secure all loose-shipped
items.













Packaged Direct Expansion (DX) Units


















All DX refrigeration systems are factory
assembled, leak tested, charged with
refrigerant, and run tested.

All

refrigerant

systems

include

an

evaporator, condenser, liquid line filter
driers, thermal expansion valves (TXV) and
scroll

compressors.

Compressors

are

equipped with a positive pressure forced
lubrication system.
















CRANKCASE HEATER

OPERATION

Some units are equipped with
compressor

crankcase

heaters,

which should be energized at least
24 hours prior to cooling operation, to
clear any liquid refrigerant from the
compressors.


CAUTION


COMPRESSOR CYCLING

5 MINUTE MINIMUM OFF TIME

To

prevent

motor

overheating

compressors must cycle off for a
minimum of 5 minutes.

5 MINUTE MINIMUM ON TIME

To maintain the proper oil level
compressors must cycle on for a
minimum of 5 minutes.

The cycle rate must not exceed 6
starts per hour.


WARNING

Advertising