INSTEON SwitchLinc Dimmer (Dual-Band) - (2477D) Manual (Version 7.0 and Newer) User Manual

Page 4

Advertising
background image

Page 4 of 16 Rev: 3/29/2013 10:32 AM

10) Turn on power

SwitchLinc and its connected load will turn on

11) Verify SwitchLinc is working properly by tapping SwitchLinc on

and off

SwitchLinc and its connected load will turn on and off

12) Reinstall the wallplate

Installation – Circuit with 2 Switches (a.k.a. 3-way circuit)

Circuits with 2 switches are called 3-way circuits. Both switches in a 3-way circuit need to be replaced by
SwitchLincs (and/or other INSTEON devices).

1)

Turn off circuit breaker(s) and/or remove fuse(s)
feeding wall boxes (verify that power is off)

2)

Pull both switches from their wall boxes (each
switch will have no less than 3 wires)

3)

Remove wires from existing switches

4)

Make sure wires are safely separated from each
other and turn power back on

5)

Using a voltage meter measure each wire to
ground in both boxes until you find the single wire
supplying 100-277V (line)
a. We will now refer to that location as Box 1
b. The other box will have the load wire. That will

be Box 2

6)

Turn power back off


In Box 1 (Line box)

7)

Connect bare SwitchLinc ground to bare ground
wire or ground screw in wall box

8)

Connect SwitchLinc white wire to neutral wire(s) in
wall box (usually white)

9)

Using a wire nut, cap SwitchLinc red wire.

10) Connect SwitchLinc black wire to Line wire in wall

box (usually black) along with one traveler wire
running between boxes. (preferably black) Note
color of this traveler – it will carry 100-277V/line
voltage to Box 2.

11) Cap unused traveler

In Box 2 (Load box)

12) Connect SwitchLinc bare wire to bare ground wire or ground screw in wall box
13) Connect SwitchLinc white wire to neutral wire(s) in wall box (usually white)
14) Connect SwitchLinc red wire to load wire
15) Connect SwitchLinc black wire to same color traveler from Box 1 carrying Line (usually black)
16) Cap unused traveler wire
17) With LEDs on left, gently place SwitchLincs into their wall boxes and screw in place
18) Turn power back on

SwitchLincs and connected load will turn on (only SwitchLinc in Box 2 will operate load)

Advertising