Power Wiring

NOTE: DO NOT APPLY POWER UNTIL THE INSTALLATION

IS COMPLETE. TURN MAIN POWER SWITCH OFF BEFORE
WIRING.

1. Route two wires between the AE-100 and the power transformer.

For power wire runs up to 100 feet, use 18 AWG, THHN 600-volt
insulated wire.
For power wire runs up to 200 feet, use 16 AWG, THHN 600-volt
insulated wire.

2. Connect the wires to the transformer. Connect the other

end of the wires to the AE-100 16 VAC terminals.

Backup Battery

Use of a battery backup is optional. It will allow the AE-100 to operate for
short periods of time without AC power. The door or gate access device
must use some type of battery backup of its own for the entire system to
be functional.
A 1.2 amp/hour backup battery will fi t into the AE-100 case. If using a
larger external battery (up to 7 amp/hour capacity), protect the backup
battery inside a rain-tight NEMA enclosure suitable for the installation
and splice into the two AE-100 battery wires.

NOTE: A backup battery is not required to maintain the AE-100

programming memory during power outages.

1A. For an internal backup battery, place the battery

on the bottom of the AE-100 cabinet.

NOTE: UL Listing requires that the internal backup battery must

be secured to the cabinet with double-stick tape or by using another
secure method.

1B. For an external backup battery, cut off the two spade lugs from

the AE-100’s battery wires. Route two red and black 18 AWG
wires between the AE-100 and the backup battery location.
Splice and insulate the wires to the AE-100’s red and black
battery wires. OBSERVE POLARITY! Use the two spade lugs
from the AE-100 or new spade lugs to connect to the battery.

2. Connect the battery positive to the RED wire.
3. Connect the battery negative to the BLACK wire.

Earth Ground

For the best ground, use size 12 gauge solid wire or larger to connect
the AE-100 to an 8-foot copper ground rod. Locate the ground rod next
to the Power and Telephone company rods and bond the rods together
with a new clamp. Do not disturb the clamps installed by the Power or
Telephone Company. Alternately, connect to a cold water pipe for the
earth ground.

1. Connect the wire from the earth ground to the

AE-100’s CASE GROUND STUD.

NOTE: The circuit board’s GROUND terminal is internally

connected to the EARTH GROUND STUD by a green ground wire.

Main Power Switch

After the installation’s wiring is complete, set the MAIN POWER switch to
ON to apply power to the system for programming and testing.

16 VAC

20 VA

TRANSFORMER

EARTH

GROUND

STAKE

12 VOLT

BATTERY

16 VAC
POWER
TERMINALS

CASE EARTH
GROUND
STUD

BACKUP
BATTERY
LEADS

BACKUP BATTERY

INTERNAL 1.2 AMP/HOUR P/N 100104

EXTERNAL UP TO 7 AMP/HOUR

RED