CONNECTING

Initial Connection and Startup Sequence

1. If the UPS is already installed and operating, continue to Step 3.

2. Install the UPS and any optional Extended Battery Packs or Modules according to UPS

manufacturers’ documentation. Do not connect loads to the UPS (Proceed to step 5)

3. Prepare your equipment for shutdown.

4. Turn the UPS OFF in accordance with UPS manufacturers’ documentation.

5. Unplug the UPS. Depending on the model of UPS it may take a few seconds for the UPS

to completely shut down. All indicators on the UPS front panel should shutdown.

6. Disconnect the protected equipment power cord(s) from the UPS.

7. Verify that the BYPASS switch on the XBDM is in the UPS position.

Figure 15 – XBDM Bypass Switch – UPS Position