MaxPower Corp XBDM User Manual

Page 7

Advertising
background image

XBDM USER’S MANUAL

BYPASS DISTRIBUTION MODULE

Xtreme Power Conversion Corporation (Rev 8/29/13)

Page 7

• Under normal operation, the UTILITY INPUT flows through the XBDM to the UPS and then out to

the CONNECTED LOADS.

Figure 1 – Block Diagram with UPS

As shown in fig. 2 block diagram:

• Under maintenance operation, the UTILITY INPUT flows through the XBDM to the CONNECTED

LOADS – the UPS is not in the circuit.

Figure 2 – Block Diagram without UPS

Advertising