Powerhold installation overview, Installation – Poweramp POWERHOLD SC SERIES User Manual

Page 12

Advertising
background image

INSTALLATION

4111-0016 — Sept 2010

10

IO

P

H

P

R

06/

04

For comprehensive installation instructions of the PowerHold

read and understand the Installation and Operation Manual.

PowerHold Installation Overview

POWERPACK LOCATION OPTIONS

POWERHOLD REMOTE MOUNT POWERPACK

Inside Building (Remote Mount)
Locate powerpack to minimize
obstruction potential. Hydraulic and
electrical lines from the powerpack
to the restraint are best placed
through min. 3” PVC (hydraulic)
and 3/4” (electrical) chase during pit
construction.

Under The Dock Leveler
When combined with hydraulic leveler pump or
remotely mounting under leveler, make certain
to locate the powerpack where leveler will not
interfere in below dock conditions. The routing
of hydraulic and electrical lines from the
powerpack to the restraint are best placed
through min. 3” PVC (hydraulic) and 3/4”

conduit (electrical)
chase during pit

construction.

Allow
Enough
Clearance
for Possible
Seal or
Shelter

Dock Face (Self Contained)
Appropriate location when the likelihood of
flooding, snow removal and damage from
trailer/trucks is minimal. Also recommended
for use with non-hydraulically powered dock
levelers.

Coordinate powerpack location and hose
length for proper placement.

Advertising
This manual is related to the following products: