Operation, Archive, Opera – Ransburg 9040 Cascade LV Control Unit 76580 User Manual

Page 24: Opera operation tion tion tion tion

Advertising
background image

CP-97-04.3

2 1

2 1

2 1

2 1

2 1

9040 Cascade Low Voltage Control Unit - Operation

>

>>

>

> The user MUST

MUST

MUST

MUST

MUST read and be familiar with

the SAFETY PRECAUTIONS and

SAFETY PRECAUTIONS and

SAFETY PRECAUTIONS and

SAFETY PRECAUTIONS and

SAFETY PRECAUTIONS and

SAFETY SECTIONS

SAFETY SECTIONS

SAFETY SECTIONS

SAFETY SECTIONS

SAFETY SECTIONS of this manual and
the ITW Ransburg safety literure therein
identified BEFORE OPERATING

BEFORE OPERATING

BEFORE OPERATING

BEFORE OPERATING

BEFORE OPERATING the 9040

Cascade control unit.

W A R N I N G

W A R N I N G

W A R N I N G

W A R N I N G

W A R N I N G

!!!!!

OPERA

OPERA

OPERA

OPERA

OPERATION

TION

TION

TION

TION

>

>>

>

> The electrical discharge that is available
from the charging electrode of the applicator
must not exceed 0.25 mJ of energy. To
achieve this limit, any flow of energy from the
paint supply through the paint line to the
applicator electrode must be prevented by
grounding the paint line at the applicator
handle or body.

>

>

>

>

> Verify that the applicator is actually
grounded before operating it! (See the
appropriate applicator manual.) If improper
readings are obtained, check that the control
unit is grounded. (See “Ground Test
Procedures” in the “Maintenance -
Troubleshooting” section of this manual.)

W A R N I N G

W A R N I N G

W A R N I N G

W A R N I N G

W A R N I N G

!!!!!

Figure 8: Operating Controls

Figure 8: Operating Controls

Figure 8: Operating Controls

Figure 8: Operating Controls

Figure 8: Operating Controls

ARCHIVE

Advertising