Tests requiring dut actions – Teledyne LeCroy Protocol PCI Express Script Automation Test Tool User Manual

Page 35

Advertising
background image

Teledyne LeCroy

PCI Express Script Automation Test Tool User Manual

31

3.1.2.4 Tests Requiring DUT Actions


The following three tests require some DUT actions to check all assertions. When the test is executed, the
PCI Express Script Automation Test Tool instructs the PETrainer™ to wait for the specific DUT action at the
proper point with the timeout of four seconds.

If the DUT does not send the expected TLP, the test proceeds to the next stage. When verification is executed, it
checks for the presence of the DUT actions at the proper stages.

If the DUT did not send the TLPs expected, the corresponding assertions are not checked, and the notification is
given in the log.

If no assertions could be checked for a test run, it is declared DONE rather then PASSED or FAILED.

Advertising