4 wall mounting, Figure 5-21: wall-mounting bracket – IEI Integration DM_Series v1.14 User Manual

Page 145

Advertising
background image

DM Series Industrial Monitor

Page
145

5.5.4 Wall Mounting

CAUTION:

Due to safety concerns, it is highly recommended to use the VESA mounting

kits provided by IEI for wall, stand and arm mounting. If the VESA mounting kit

is purchased separately, please make sure the mounting kit is UL-listed.

To mount the DM series industrial monitor onto a wall, please follow the steps below.

Step 1:

Select a location on the wall for the wall-mounting bracket.

Step 2:

Carefully mark the locations of the four bracket screw holes on the wall.

Step 3:

Drill four pilot holes at the marked locations on the wall for the bracket retention

screws.

Step 4:

Align the wall-mounting bracket screw holes with the pilot holes.

Step 5:

Secure the mounting-bracket to the wall by inserting the retention screws into

the four pilot holes and tightening them (Figure 5-21).

Figure 5-21: Wall-mounting Bracket

Step 6:

Insert the four monitor mounting screws (M4 screws) provided in the wall

Advertising