Maple Systems MAPware-100 User Manual

Page 8

Advertising
background image

Step 4: Send Your Project to the Operator Interface Terminal

1. Apply 24 VDC to the OIT. At this point the OIT will display the following messages:

***System is not configured!*** and Press ANY key to enter download mode.

Press a key on the OIT keypad. The message indicates that the OIT is ready to receive

a project from MAPware 100.

2. In MAPware 100, from the Transfer menu, choose Send to OIT.
3. The Send To OIT dialog box appears (see Figure 7). If you are using a serial port other

than COM 1, choose the Options button.

4. The Communication Options dialog box appears (see Figure 7). In the PC Serial Port

group box, select the option button for the COM port you are connected to and then

choose the Done button.

5. You are now back in the Send to OIT dialog box. Choose the OK button.
6. MAPware 100 will now send the entire OIT project file to the OIT. The project

transfer will take a couple of minutes. When the transfer is complete MAPware 100

will restart the OIT. The OIT will then attempt to attach to the PLC.

Step 5: Connect the Operator Interface Terminal to the PLC

1. Connect the OIT to your PLC as per the installation manual supplied with your OIT.
2. Make sure you use the correct cable to connect the OIT to your PLC. Contact your

local distributor or Maple Systems Technical Support if you need assistance in

choosing the appropriate cable.

3. When the OIT attaches to the PLC, the startup screen you created in your first project

appears on the screen.

MAPware 100 User's Guide

7

1010-0089, REV00

Figure 7 Send to OIT & Communication Options Dialog Box

Advertising