A) no flow (the fluid velocity is completely zero) – Yokogawa FieldMate User Manual

Page 47

Advertising
background image

<6 OPERATION>

6-15

IM 01R01A11-01EN

(A) No Flow (The fluid velocity is completely zero)

1) Fill the flowtube with fluid completely. Be sure that the fluid velocity is completely zero.

2

3

1

F060203.ai

Figure 6.2.3 “Flow/ No Flow” Screen

Table 6.2.3 “Flow/ No Flow” Screen

Item

No.

Item Name

Description

1

No Flow

Selects the “No Flow” test condition.

2

Start Verification (*1)

Runs “Circuit” check and “Device Status” check.

These checks are performed automatically. The Progress Bar is displayed

at the bottom left.

3

Cancel

Stops running “Circuit” check and “Device Status” check.

*1:

When the AXF protect function is set to “Protect”,

Figure 3.2.2 is displayed. Follow 3.2.2.

2) Select “No Flow (1)” and click “Start Verification (2)”.
3) Before running “Circuit” check and “Device Status” check,

Figure 6.2.4 is displayed.