Sterling QVEB User Manual

Page 25

Advertising
background image

Figure 22 - Power Venter Assembly

NOTES:
*1) For item No. 6, use counter-clockwise rotation.
2) DO NOT OVERTIGHTEN CELCON NUT! HAND TIGHTEN ONLY! DO NOT USE TOOLS!

Approximate 1/3 turn maximum or 8 inch pounds is suffi cient from the point where the tube does not slip in or out.

3) Flue Sizes:

100/175 units: 4" dia. fl ue outlet Reducer required – To be supplied by installer.

200/250 units: 5" dia. fl ue outlet (no adapter required).

300/400 units: 6" dia. fl ue outlet Increaser required – To be supplied by manufacturer.

25

REF.
NO. DESCRIPTION
1

Blower Housing Assembly

2

Speed Nut

3

Motor

4

Washer, Plain

5

Plate Adapter

6

Blower Wheel*

7

Mounting Bracket (Pressure Switch)

8

Mounting Bracket (Junction Box)

9

Screw, S.T.

10

Screw, Machine (L =

3

/

4

")

11

Nut, Keps (Ext. Lock Washer)

12

Air Pressure Switch

REF.
NO. DESCRIPTION
13 Drill

Screw

14

Junction Box Cover

15 Snap

Bushing

16 Relay

(Motor)

17

Draftor Stack Assembly

18

Tubing Formation (Aluminum)

19 Male

Connector

20 Locknut
21 Hole

Plug

22

Pressure Switch Cover

23 Drill

Screw

24

Junction Box Base

25-28 Power

Connection

Advertising