Renkus-Heinz VAX15S User Manual

Page 7

Advertising
background image

Point Source Array Modules

Assembling Vertical Line Arrays

1. Attach the RHANG101LA Flybar to the top cabinet

using the quick release pins. Note the bridle construction

which allows you to move the suspension bar laterally

and adjust the array’s tilt (aiming angle). Move the bridle

toward the rear of the cabinets for more tilt.

If you are using a VA / VAX15S subwoofer as a suspen-

sion platform, you will also need to remove the four feet

from the sub to allow it and the top array module to fit

snugly together.

2. Attach the lifting device (chain hoist, fork lift, etc) you

will use to raise the cabinet into position to the flybar.

One commonly used arrangement is shackles and a

sling.

3 Raise the cabinet high enough to let you roll or slide

the next cabinet into position beneath it and lower the

first cabinet into position over the second cabinet and

use the quick release pins and joining bars to lock the

two cabinets together. Move the joining bars from the

upper cabinet down into the lower cabinet.

5. Repeat the procedure until the array is complete and

then lift (hoist) the array into position and secure it. Note

that you will need to use special connecting bars called

biscuits to join two unlike array modules, such as the 7.5

degree -7 and the 15 degree -15 modules.

Transitional wave guides are also available to assist in

shaping the array's horizontal coverage to fit the audi-

ence area without introducing discontinuities between

the array modules.

Transitional

Coverage Balloon

Page 7

Advertising
This manual is related to the following products: