3 electrical connections – Sterlco SGBD Series Batch Gravimetric Blenders User Manual

Page 34

Advertising
background image

BLN1-600

Chapter 3: Installation

34 of 110

Make sure that adequate space is around the blender (36” recommended) to allow proper
cleaning, servicing, etc.

Floor Mount (Central Blender)

maintenance. The operator and maintenance personnel must have access to parts of the
blender. If necessary, it is the customer’s responsibility to provide adequate, safe work
platforms around the blender to meet state and local safety codes. Using proper lifting
equipment, lift the Slide Gate blender into place.

Make sure that the blender is securely mounted to the floor before installing loading
equipment, loading with material, and starting.

Make sure that the blender location is adequately away from high traffic aisles, and that fork
trucks, etc. cannot damage the blender. Ensure that normal day-to-day operations will not
place the blending system at risk of damage.

Figure 22: Typical Floor Mount (Central) Blender Layout

3-3 Electrical Connections

The standard Slide Gate/Auger blending system is designed to operate on 120-240/1/60 or
110-220/1/50 supply voltage. The current requirements vary with the blender’s size and
throughput rating. For exact current requirements, check the blender serial number tag,
located on the rear plate of the mixer section.

The blender must be securely fastened to the floor before operating.

Manufacturer assumes no responsibility for any damages resulting from

improper installation or improper handling during installation.

Advertising