Timeguard SLFM360 User Manual

Page 3

Advertising
background image

2

Wiring cover

Factory fitted
bridge wire
REMOVED

L1

L N E

Switched
Load
OUT

Factory fitted
bridge wire

Levering area

Time On

setting

Lux -

Dusk/Dawn

setting

Mains
Supply
IN

In the above illustration:
- 4 core cable may be used
- there is no external junction box
- A bridge is provided, prewired to bridge
across live supply from AC mains to the
output load via the contacts

In the above illustration:
- the L1 L2 terminals are used to control a
DC load or if the load uses a different phase
or voltage supply from the AC mains in.
- factory fitted bridge must be removed to
isolate L1 & L2 terminals from AC mains in.

Cable clamps x2

Locators

L

ocating

springs
pulled
back

L

ocating

springs
fitted
position

Sensor

Levering area

D

E

F

G

L1

L N E

Switched
Load
OUT

Mains
Supply
IN

SLFM360_Instruct_art_2.2.qxd 3/5/06 10:05 am Page 2

Advertising