Connection – Timeguard SLFM360 User Manual

Page 6

Advertising
background image

5

Connection

THERE ARE 2 POSSIBLE CONNECTION SCENARIOS
1. Standard connection (see diagram E).
The factory fitted “bridge” wire must not be removed.
Connect the 3 or 4 core mains supply cable to the
terminal block on the unit as follows:-
NEUTRAL (Blue) N
EARTH (Green/Yellow)
LIVE (Brown)

L

Connect the fourth core (lighting live) of the four core
cable (if used) to the L1 terminal block or the second 3
core cable (from the lighting) to L1 (brown), N (blue)
and E (green/yellow).
2. Switching DC loads or loads which use a different
phase or voltage supply from the AC mains (see
diagram F). Remove the factory fitted bridge wire.
Connect the 3 core mains supply cable to the terminal
block on the unit as follows:-
NEUTRAL (Blue) N
EARTH (Green/Yellow)
LIVE (Brown)

L

Connect the load in series with the load supply
between L1 and L2 terminals.

off when not required or for maintenance purposes and
allows it to be conveniently brought into manual
override.
Remove the wiring cover from the sensor by
depressing the catch on the side and lifting it clear of
the twin locators opposite the catch (see diagram G).
Mark the position of the 75mm diameter locating hole
centre taking care to avoid ceiling joists and other
obstructions within the 75mm diameter. Drill a pilot
hole to take the centre shaft of the hole cutter. Use the
hole cutter to cut the required hole.

SLFM360_Instruct_art_2.2.qxd 3/5/06 10:05 am Page 5

Advertising