Connecting the water line – LG LTC22350SW User Manual

Page 27

Advertising
background image

27

• Remove the ring plug (1) from the valve located at the

top of such device.

• Place compression nut and the ferule at the end of the

pipeline. Insert pipeline into the connection valve as far

as possible. Hold tightly while holding pipeline.

Tubing 1/4” (6,35 mm)

Clamp Tubing

Compression
Nut 1/4”
6,35 mm

Ferrule Refrigerator
(sleeve) Connection

Hold on to the pipe from the handles or grabbers located

behind the refrigerator, loosing first the bolt holding the

handle. Afterwards, insert pipe into the hole and tighten

bolt to finalize.

10. OPEN THE BYPASS VALVE

Tighten all connections

containing leaks. Place access

cover back on compressor.

11. CONNECT TO REFRIGERATOR

Fix pipeline in a way that it does

not vibrate on the refrigerator or

wall. Push refrigerator against

wall.

12. TURN ICE MAKER ON

Turn ice maker switch into the

ON position. Ice maker

will start only after reaching its operating temperature

of 15 °F (-9 °C) or less. It will automatically begin the ice

production if switch is located in the

ON position.

CONNECTING THE WATER LINE

1

Advertising
This manual is related to the following products: