Ficon management server, Installing the ficon management server, Configuring the ficon management server – HP StorageWorks 2.32 Edge Switch User Manual

Page 169

Advertising
background image

Edge Switch Element Manager user guide 169

FICON Management Server

NOTE:

The FICON Management Server feature is available only for the Edge Switch 2/32. This

feature is not available on the Edge Switch 2/24.

The FICON Management Server is a keyed feature that allows host control and in-band

management of the switch through an IBM System/390

or zSeries 900 Parallel Enterprise Server

attached to a switch port. The server communicates with the switch through a FICON channel.

Control of connectivity and statistical product monitoring are provided through a console attached

to the host.
This section provides the following information:

Installing the FICON Management Server

, page 169

Configuring the FICON Management Server

, page 169

FICON Management Server parameters

, page 170

Installing the FICON Management Server

To install and enable the FICON Management Server, select Configure > Configure Feature

Key. For more information, see

Configuring the feature key” on page 122

.

Configuring the FICON Management Server

To configure the FICON Management Server:

1.

Select Configure > FICON Management Server.

2.

Select the Enable FICON check box to enable the Management Server.

NOTE:

To disable the Management Server, click the check box again to remove the check

mark.

3.

Click Parameters to open the Configure FICON Management Server Parameters dialog box.

(See

Open Systems Management Server

” on page 171 for details about the parameters you

can set.)

4.

Click Switch Clock Alert Mode to enable or disable switch clock alert mode.

When a check mark is displayed, the alert mode is enabled.

5.

Click Host Control Prohibited to allow or prohibit host control.

When a check mark is displayed, host control is prohibited.

6.

Click Programmed offline state control to allow or prohibit off line state control.

When a check mark is displayed, programmed control of the off line state is allowed.

7.

If necessary, click a code page from the Code Page list.

8.

Click Activate.

9.

If you have finished configuring the switch, back up the configuration data.

For more information, see

Backing up and restoring configuration data

” on page 134.

Advertising