Installing a hot-plug drive, Installing sff quick-release drive cages – HP ProLiant SL250s Gen8 Server User Manual

Page 45

Advertising
background image

Hardware options installation 45

Installing a hot-plug drive

1.

Remove the drive blank.

2.

Prepare the drive.

3.

Install the drive.

4.

Determine the status of the drive from the drive LED definitions ("

Hot-plug drive LED definitions

" on page

13

).

Installing SFF quick-release drive cages

1.

Power down the server (on page

15

).

2.

Disconnect all peripheral cables from the server.

3.

Remove the server from the chassis (on page

15

).

4.

Remove the front GPU cage (on page

16

).

Advertising