Connecting the suv cable – HP ProLiant SL250s Gen8 Server User Manual

Page 67

Advertising
background image

Hardware options installation 67

Tesla K20/K20X GPUs

11.

Install the GPU cage.

12.

Install the interposer board (on page

19

).

13.

Install the front GPU cage (on page

17

).

14.

Install the server into the chassis ("

Installing the server into the chassis

" on page

31

).

15.

Connect all peripheral cables to the server.

16.

Power up the server (on page

15

).

Connecting the SUV cable

CAUTION:

Before disconnecting the SUV cable from the connector, always squeeze the release

buttons on the sides of the connector. Failure to do so can result in damage to the equipment.

Item

Connector

Description

1

SUV port

SUV port on the server front panel

2

SUV connector

For connecting to the SUV connector on the

Advertising