ATEN Altusen KVM on the Net KN2108 User Manual

Page 31

Advertising
background image

7. Power on the Second Stage unit(s), then power on the First Stage unit.

8. Turn on the power to all the computers.

Note: The Power On sequence requires that all Second Stage units be

powered on first. After all the Second Stage units have been
powered on, the First Stage unit must be powered on next. After
the Second and First stage units have been powered on, the
computers can be powered on.

KH88

KA9120

2005-08-24

Chapter 2. Hardware Setup

19

Advertising