ROTHENBERGER ROWELD D 2/10 User Manual

Page 27

Advertising
background image

ENGLISH

25

Care must be taken to ensure that the preheat nozzle provides intensive and uniform preheating
(melting) of the base material over the entire joint width at as low a hot air temperature as possi-
ble. For larger weld seam widths, a wider preheat nozzle is available as an accessory.

5.3

Starting the hand extruder

Observe section “Safety“.

Never operate the hand extruder without air supply. Otherwise the unit may suffer

severe damage.

Before plugging in the mains connector, check that the drive unit is not set to

continuous operation.

The hot air hood (128) must be mounted to the heat guard (115) of the hand ex-

truder melting chamber.

Plug in mains connector.

In the case of the hand extruder with integrated air supply, the blower must start

automatically.

Once air exits the preheat nozzle (4), the heating systems for the air/melt tem-

peratures may be activated.

For the operation of the temperature controller, see section 5.5 ”Set temperatures“. For tem-
perature settings, see page 28.

The hand extruder will reach its operating temperature after about 10 to 15 minutes.

The drive speeds of the drive unit are set by default for the individual materials.

Hold the hand extruder only on the handles provided for this purpose.

Advertising