ROTHENBERGER ROWELD D 2/10 User Manual

Page 31

Advertising
background image

ENGLISH

29

6

Maintenance/Inspection

Pull mains connector before carrying out any maintenance and repair work on the
hand extruder.

Maintenance and repair work on electrical tools may only be carried out by qualified electricians.

The hand extruder together with the hot air hood must have cooled down to safe-to-
touch temperature.

Observe the instructions under section “Safety“.
Maintenance and repair work may only be carried out by qualified personnel or by our service
staff.
To ensure the proper function of the hand extruder over its entire service life for its intended ser-
vice, we recommend:
– to have all maintenance, inspection and mounting work carried out by authorized and quali-

fied personnel who are familiar with the operating instructions,

– to always shut off the unit before carrying out any work on it,
– to remount and reactivate all safety and protective devices immediately after completion of

the maintenance/repair work.

During maintenance and repair work, make sure that the hand extruder and its individual com-
ponents are firmly positioned.
In addition to the operating instructions and the national and local accident prevention regula-
tions applicable at the place of use, the acknowledged technical rules for safe and proper work-
ing practices must be observed.
Any working practices posing a safety risk are prohibited.

Activities other than those described in this section may only be performed at the
Manufacturer’s workshops!

After approx. 500 operating hours, the hand extruder including drive unit must be

thoroughly cleaned and inspected. This work may only be carried out at the manufacturer’s
workshops.

Cables, switches, plug-in connections must be inspected by qualified staff every

three months (requirement according to VBG4); the inspection results must be documented.

Advertising