Appendix a modem placement, Built in mounting tabs for raven x, Modem placement – Airlink X EV-DO User Manual

Page 48

Advertising
background image

Raven X EV-DO for Verizon - User Guide, version 2.34

42

APPENDIX A

Modem Placement

When decided on a location to install your Raven X, make sure the modem will be away from
direct exposure to the elements (sun, rain, etc.). Excess cables can be bundled and tied with twist-
ties or other appropriate binders, but the less the cable is wrapped and bound together, the better the
modem will perform.

Built in Mounting Tabs for Raven X

The Raven X is equipped with mounting tabs so there is no need for a seperate bracket. #6 screws
are recommended, though other solutions may be sufficient as well.

FIGURE 1.

Diagram of the Raven X bottom, showing the placement of the mounting holes

Front

A radius: 0.14” (2.5mm)

B radius: 0.075” (1.9mm)

C to C: 0.565” (14mm)

D to D: 0.315” (8mm)

E to E: 0.132” (3.3mm)

A

B

F to F: 0.315”(8mm)

G to G: 2.145” (54.48mm)

H to H: 1.895”(48.13mm)

I to I: 0.565” (14.35mm)

K to K: 0.665”(16.89mm)

L to L: 0.257” (6.53mm)

M to M: 5.385”(136.7mm)

N to N: 4.615” (117mm)

CD

DE

CE

FGHI

LM

L

M

HK

F

I

G

K

5.642”(143mm)

(65mm)

2.5”

N

N

Advertising