Replacing the release sheet (every 4 - 6 weeks), Replacing the release sheet (every 4 - 6 weeks) 12, Replacing optional belt wraps and measuring the – Antunes, AJ VCT-1000 User Manual

Page 12: Every 3 - 6 months), Vertical contact toaster, Maintenance (continued)

Advertising
background image

VERTICAL CONTACT TOASTER

12

P/N 1010807 Rev. E 06/06

MAINTENANCE (continued)

Replacing Optional Belt Wraps and

Measuring the Conveyor Belt Chains and

Optional Roller Tensioners (Every 3 - 6

months)

REPLACING BELT WRAPS

NOTE: Depending on toaster usage and how well

they are cleaned daily, the Belt Wraps should

last between 3 - 6 months. Additional Belt Wraps

may be purchased from your Authorized Service

Agency.
1. Turn unit off, unplug the power cord, and allow

the unit to cool before proceeding.

2. Remove the Bun Feeder and Heat Shield and set

the Bun Thickness Compression Knobs to 6 & 6.

3. Open both Conveyor Covers and pull the Belt

Wrap Pin out of the “zipper” (Figure 8).

4. Remove and discard the old Belt Wrap(s).

5. Clean both Conveyor Belt Chains just as you

would clean the Belt Wraps during daily cleaning

(Figure 8).

6. Install the new Belt Wrap(s) around the Conveyor

Belt Chains inside the yellow rods with the “zip-

per” flap exposed and hanging down (Figures 9 &

10).

CA

UT

ION

INCORRECT

CORRECT

Figure 9. Installing Belt Wrap

Figure 10. Aligning Belt Teeth

Belt Wrap

Pin

Belt Rotation

Upper Support Rod

Lower

Support Rod

CAUTION

Position the Belt Wrap UNDER the upper and lower

yellow support rods or damage to the unit may occur.

CAUTION

Align the ends of the Belt Wrap properly (Figure 13)

or the Belt Wrap may be damaged.

Figure 8. Removing Optional Belt Wrap

Interlock

Switch

Conveyor

Cover Assy.

Belt Wrap

Pin

Replacing the Release Sheet (Every 4 - 6

weeks)

NOTE: Depending on toaster usage and on how

well it is cleaned daily, the Release Sheet should
last between 45 - 60 days.
1. Remove and discard the Release Sheet.

2. Lay a new Release Sheet on a clean, dry surface

and fold it in half lengthwise and gently crease it

at the fold using only your fingers.

3. Install the Release Sheet just as you would after

daily cleaning (see diagram below).

Fold over so

ends meet.

Press Lightly with fin-

ger to form crease.

7. Close the Conveyor Cover(s), set the Bun

Thickness Compression Knobs back to their nor-

mal settings and reinstall the Heat Shield and Bun

Feeder.

Conveyor Belt

Chains

Advertising