2 connection procedure – WIKA DPT-10 User Manual

Page 31

Advertising
background image

Take note of the corresponding installation regulations for Ex
applications. In particular, make sure that no potential equalisation
currents flow over the cable screen. In case of grounding on both sides
this can be achieved by the use of a capacitor or a separate potential
equalisation.

5

.2 Connection procedure

Proceed as follows:

1

Unscrew the housing cover

2

If an indicating and adjustment module is installed, remove it by
turning it slightly to the left.

3

Loosen compression nut of the cable entry

4

Remove approx. 10 cm of the cable mantle, strip approx. 1 cm
insulation from the individual wires

5

Insert the cable through the cable gland into the sensor

6

Lift the opening levers of the terminals with a screwdriver (see
following illustration)

7

Insert the wire ends into the open terminals according to the wiring
plan

8

Press down the opening levers of the terminals, you will hear the
terminal spring closing

9

Check the hold of the wires in the terminals by lightly pulling on
them

10 Connect the screen to the internal ground terminal, connect the

outer ground terminal with potential equalisation

11 Tighten the compression nut of the cable entry. The seal ring must

completely encircle the cable

12 Screw the housing cover on

Select connec-
tion cable for Ex
applications

Single/Double chamber
housing

Differential pressure transmitter DPT10 - metal measuring diaphragm • Profibus PA

31

5 Connecting to power supply

37245

-

EN

-100120

Advertising