WIKA DPT-10 User Manual
Page 64
+
A
B
6
7
3
2
4
1
5
+
–
II
I
III
III
Fig. 47: Preferred installation for closed vessels
I
DPT10
II
3
-fold valve block
III
Precipitator
1
, 5 Drain valves
2
, 4 Inlet valves
6
, 7 Vent valves on DPT10
A, B Blocking valves
Proceed as follows:
1
Fill the vessel to just above the lower tap
2
Fill measuring system with medium
Close valve 3: Separate plus and minus side
Open valve A and B: Open block valves
3
Vent plus side (probably empty minus side)
Open valve 2 and 4: Discharge medium on the plus side
Briefly open valve 6 and 7, then close again: Fill the plus side
completely with the medium and remove air.
4
Set measurement loop to operation
Now:
Valve 3, 6 and 7 are closed
Valves 2, 4, A and B are open
Then carry out adjustment, see below.
Installation for closed
vessels
Prepare the adjustment
64
Differential pressure transmitter DPT10 - metal measuring diaphragm • Profibus PA
8 Set up
37245
-EN
-100120