Kip request operator guide – Konica Minolta KIP C7800 User Manual

Page 82

Advertising
background image

KIP Request Operator Guide

This information is solely for use of KIP Personnel and KIP Authorized Dealers. No part of this publication may be copied,

reproduced or distributed in any form without express written permission from KIP. © 2011 KIP.

- 78 -

Meter Reading

This report will include daily Meter readings from the desired dates set in the Start Date and End Date.

The report will include Date, Meter A, Meter B and Total run. This meter reading should closely match the
actual meter reading on the KIP IPS printer. The user can select the Start Date and the End Date of the

report along with what to do with this data. The report can be sent directly to the default printer
attached to the PC generating the report or to the Notepad to be saved to a file.

Advertising
This manual is related to the following products: