Step 10 install cable arm cable – BodyCraft BCG-GX User Manual

Page 17

Advertising
background image

16

STEP 10 INSTALL CABLE ARM CABLE

1. The Cable Arm Cable (91) is already run through the Cable Arms (14). Mount Pulleys P3 and P7,

along with their Pulley Guide Brackets (32) to the Cable Arm Assembly (11) as shown using one 3/8"

X 1-3/4" Hex Bolt (101) and one 3/8" Nylon Nut (124). Route the cable over top of these pulleys.

Tighten these nuts, making sure the Pulley Guide Brackets (32) do not rub against the cable.

2. Continue routing, on both sides, down and around Pulleys P4 and P6 mounted to the base of the

Cable Arm Assembly (11) using one 3/8" X 4-3/4" Hex Bolt (96), two Pulley Guide Brackets (32), and

one 3/8" Nylon Nut (124). As above, tighten this nut, making sure the Pulley Guide Brackets (32) do

not rub against the cable.

3. Route the cable up to Pulley P5 mounted inside the Adj. Floating Pulley Block (20) using one 3/8" X

1-3/4" Hex Bolt (101), the Cable Guide Plate (25) and one 3/8" Nylon Nut (124). Loosely hook the

Cable Guide Plate (25) to the Connect Cable (90), directly behind.

Advertising