Pre-fab insert installation, Minimum clearances installation preparation – New Buck Corporation 20 Room Heater User Manual

Page 25

Advertising
background image

SECTION V

PRE-FAB INSERT INSTALLATION

INSTALLATION PRECAUTIONS


This room heater is listed by Warnock-Hersey Laboratories for installation into the following Zero-Clearance
Cabinet Models. These are:

MAJESTIC—M-36, M-43, L-36, L-42, MD36, MD42, MD36-AO, MD42-AO


HEATILATOR—FP36, 3036, 3042, 3048, 3138, 3138 EP


PREWAY—DW36, DW42, BI36, BI42, BI36B, BI42B, BI36EM, BI42EM, BI36CEM, BR42CEM,

BI36SEM, BI42SEM


NOTE: A Preway unit has to use insert trim panels.


Other models of those brands may also be acceptable for installation of the Model 20 unit into them. However,
factory approval from New Buck Corporation and Warnock-Hersey Laboratories is required prior to installation.
Installation must conform to New Buck Corporation installation instructions or addendums.

INSTALLATION

(Pre-Fab Fireplace Insert)














MINIMUM CLEARANCES


INSTALLATION PREPARATION

Pre-Fab Fireplace

1. Locate furniture and other materials away from the front of the fireplace to allow free access to the fireplace.
2. Cover the hearth and adjacent floor areas with the drop cloth to protect from soiling or marring the surface.
3. Remove the existing fireplace damper plate/damper rod assembly.

FIGURE 1 PRE-FAB FIREPLACE INSERT

Advertising