Final check, Caution – New Buck Corporation 81 User Manual

Page 22

Advertising
background image

FINAL CHECK

1. Recheck specified clearances.

2. Remove all foreign material from firebox area.

3. Open primary air draft.

NOTE: Plug power cord into a 115V AC outlet. Set switch to “Manual” and rheostat to
“High” position to ensure motor operates properly. Route cord to prevent damage to cord
insulation from heat and sharp objects. Keep cord out of way of traffic toprevent damage
caused by tripping, etc.

4. Place crumpled pieces of newspaper in stove. Light it and close door. Ensure that

stove draws properly through primary draft.


5. Check for smoke leaks around door.


CAUTION


Open door and check for smoke escaping from front of stove. Smoking usually indicates a
defective or poorly positioned chimney. Some chimneys with a marginal draft can be pre-
heated by lighting newspaper and holding it near open damper with a poker or fire tong.
Once the chimney heats up, a proper draft can usually be obtained.


If a thorough review of the Troubleshooting Guide in rear of manual does not reveal problem,
contact your dealer for assistance.

CAUTION

The unit is painted with a specially formulated high temperature paint that cures during
the first two or three firings. You may notice a slight smoking effect and an odor of
burning paint when you build first fires. This is normal and is not a cause for alarm. In
some cases, these fumes will activate a smoke alarm. Opening a window near unit will
allow these fumes to escape. DO NOT build a large, roaring fire until this curing is
complete or heater finish may be damaged.

Page 20

Advertising