Operating procedures, 1 power source, 2 preparation for embroidering – Brother BE-1201B-AC-PC User Manual

Page 184

Advertising
background image

7-2

BE-0901E-AC-PC• BE-1201B-AC-PC

Chapter 7 Operation of Machine

1. Turn the power on to the machine.

2. When the machine is equipped with the

shut-off switch unit, Reset the emergency
stop button.

3. When the machine is equipped with the

shut-off switch unit, Press the power
switch.

4. The power lamp lights up and a message is

displayed on the LCD.

BE-1201B-AC-PC

W1604

BE-0901E-AC-PC

W1605

The alarm sounds three times and the

presser foot move upward. Then the
hoop moves to the zero point and the
sewing data screen is displayed.

Note) When turning the power off and back it

on again, wait for at least 10 seconds.

1. Operating Procedures

1-1 Power Source

W1262Q

Shut-off switch unit

W1606

1-2 Preparation for Embroidering

1. Select embroidering data while the machine is in the waiting state for an embroidering data

selection, and transmit required data by pressing the

icon.

2. The READY lamp lights up and the machine is placed in the waiting state.

3. Pressing

, determine a position to start embroidering.

An error code is displayed in the display window if a pattern comes out of the hoop.

4. Pressing

starts embroidering.

During embroidering, the speed is indicated in the display window.

5. After embroidering is finished, the machine is placed in the stand-by state.

Emergency stop switch

Power switch

Advertising
This manual is related to the following products: