Installation, 1 transportation of machine, 2 installation of machine – Brother BE-1201B-AC-PC User Manual

Page 31: Installation danger

Advertising
background image

BE-0901E-AC-PC• BE-1201B-AC-PC

2-3

Chapter 2 Preparation of Embroidery Machine

2. Installation

DANGER

Embroidery machines should be installed only

by trained engineers.

Electric wiring should be laid by your

distributor or electric experts.

Install a machine in a place away from a high-

frequency welding machine or other machines that

may generate a strong electric noise. Failure to do

so may cause the embroidery machine to

malfunction.

The sewing machine weighs more than 195

kg. The installation should be carried out by

two or more people.

Be sure to connect the ground. If the ground

connection is not secure, you run a high risk of

receiving a serious electric shock, and problems

with correct operation may also occur.

Do not connect the power source until

installation is completed. Doing so may start

the machine unintentionally through an

accidental activation of the START switch,

resulting in bodily injuries.

Secure the machine with the nuts when installing it

so that it will not move by placing the leveling seat

on the sound floor.

* After installation is completed, get the power supply from a dedicated outlet.
* When connecting multiple machines, exercise care not to exceed the capacity of the outlet.

2-1 Transportation of Machine

When relocating the machine, lift it by the steel frame.

Note) Never lift the machine by the table or the guard bar.

2-2 Installation of Machine

W1565

1

Adjust leveling seats [1] by turning nuts [2]
in the direction of the arrow until the table
top is placed horizontally.

2

If the table is not stable, loosen nuts [2] and
turn leveling seats [1] for adjustment.

When relocating the machine, raise leveling
seats [1]. The machine can then be moved

with casters [3].

[3]

[1]

[2]