Service, Torque chart, Service tools – MBW GPR135 User Manual

Page 12: Main disassembly procedure (diesel engine), Ervice

Advertising
background image

- 9 -

S

ERVICE

Assembly and disassembly should be preformed by a
service technician who has been factory trained on MBW
equipment. the unit should be clean and free of debris.
Pressure washing before disassembly is recommended.

• Prior to assembly, wash all parts in a suitable cleaner or

solvent.

• Check moving parts for wear and failure. Refer to the

Replacement Section of this manual for tolerances and
replacement cycles.

• All shafts and housings should be oiled prior to pressing

bearings. Also ensure that bearings are pressed square
and are seated properly.

• All bearings should be replaced when rebuilding any

exciter or gearbox.

• All gaskets and seals should be replaced after any

disassembly.

Torque Chart

Service Tools

Main Disassembly Procedure (Diesel Engine)

Refer to Main Assembly, page 22. for disassembly.

1.

Clean all visible debris from the machine before
servicing.

2.

Remove the four hex head capscrews (#32) securing
the engine deck (#20) to the baseplate (#5). Use
caution as the engine deck will drop down.

Refer to DIESEL ENGINE ASSEMBLY, page 38. Sections

of this manual for belt guard & belt removal.

3.

Remove the four socket head capscrews (#32)
securing the belt guard (12) to the mount plate (#16)
on the engine (#15) and remove the beltguard.

4.

Slide the belt (#4) off the clutch (#7).

5.

Remove the two flange screws (#23) securing the
bellows retainer (#15), and remove the retainer.

6.

Push the lip of the bellows (#3) through the hole in the
engine deck.

7.

Disconnect the hydraulic line (#21) from the control
head in the handle assembly. Keep the end of the
hydraulic line and control head fitting free of dirt and
debris by using tape. Be careful to use a drain pan
to catch the hydraulic oil.

8.

Use the main lift hook on the rollcage (#19) to
separate the engine deck from the baseplate. Be
careful to guide the hydraulic line through the
handle assembly and engine deck as the
subassemblies are separated to prevent damage
to components.
If further disassembly of the engine
deck is required proceed to step 9. If baseplate
service is required refer to the Baseplate
Disassembly Procedure
section of this manual.

9.

Disconnect the throttle cable (#18) from the engine.

10. Remove the handle assembly by removing the four

flange screws (#28) securing the handle shock mount
(#19) to the engine deck (#21).

11. Remove the four hex head capscrews (#33) securing

the rollcage to the engine deck and remove the
rollcage.

SIZE

GRADE 2

GRADE 5

GRADE 8

1/4-20

49 in

lbs

76 in

lbs

9 ft

lbs

1/4-28

56 in

lbs

87 in

lbs

10 ft

lbs

5/16-18

8 ft

lbs

13 ft

lbs

18 ft

lbs

5/16-24

9 ft

lbs

14 ft

lbs

20 ft

lbs

3/8-16

15 ft

lbs

23 ft

lbs

33 ft

lbs

3/8-24

17 ft

lbs

26 ft

lbs

37 ft

lbs

7/16-14

24 ft

lbs

37 ft

lbs

52 ft

lbs

7/16-20

27 ft

lbs

41 ft

lbs

58 ft

lbs

1/2-13

37 ft

lbs

57 ft

lbs

80 ft

lbs

1/2-20

41 ft

lbs

64 ft

lbs

90 ft

lbs

9/16-12

53 ft

lbs

82 ft

lbs

115 ft

lbs

5/8-11

73 ft

lbs

112 ft

lbs

159 ft

lbs

5/8-18

83 ft

lbs

112 ft

lbs

180 ft

lbs

3/4-16

144 ft

lbs

200 ft

lbs

315 ft

lbs

1-8

188 ft

lbs

483 ft

lbs

682 ft

lbs

1-14

210 ft

lbs

541 ft

lbs

764 ft

lbs

1-1/2-6

652 ft

lbs

1462 ft

lbs

2371 ft

lbs

M 6

3 ft

lbs

4 ft

lbs

7 ft

lbs

M 8

6 ft

lbs

10 ft

lbs

18 ft

lbs

M 10

10 ft

lbs

20 ft

lbs

30 ft

lbs

CONVERSIONS

in

lbs x 0.083 = ft

lbs

ft

lbs x 12 = in

lbs

ft

lbs x 0.1383 = kg

m

ft

lbs x 1.3558 = N

m

Part No.

Description

16129

Rubber Test Mat

16031

Decal Set

17368

Kit, Rebuild, Lower Hydraulic

19606

Kit, Rebuild, Upper Hydraulic

Advertising
This manual is related to the following products: