Synergy 5221-A - 2011+ Jeep JK 2/4 Door Front Cage Kit User Manual

Page 9

Advertising
background image

17. Install the 3/8-16  UNC  x  1”  bolts  as shown with washers under the heads of the bolts,

and flange nuts on the underside. Snug hardware down to secure A-pillar floor plate.

18. Next, install the frame tie in as shown and prep area for welding. However, do not

weld at this time.

Advertising