Figure 9-3


d) Install the u-bolt over the axle tube and through the track bar relocation bracket,

use a flat washer and nylock nut to secure the u-bolt.

e) Once all the hardware is installed in the track bar relocation bracket you can begin

to torque all the hardware. Torque the 9/16 bolt to 150 ft-lbs, the ½” bolts to 90
ft-lbs, and the 3/8” bolts and u-bolt to 40 ft-lbs. Wait until the jeep is sitting at
right height to attach the track bar.

10. INSTALL STEERING STABILIZER

a) The track bar relocation bracket also allows you to relocate the steering stabilizer

to the top of the tie rod.

b) Loosen the u-bolts on the tie rod steering stabilizer bracket and rotate it to the top

of the tie rod as shown in Figure 10-1. Tighten the u-bolts when finished. Attach
the large end of the steering stabilizer to the tie rod bracket.

c) Attach the shaft end of the steering stabilizer to the track bar relocation bracket

using the factory nut and bolt and a ½ washer between the bushing and the track
bar relocation bracket. See Figure 10-2

d) Tighten both steering stabilizer mounting bolts to 60 ft-lbs.

Figure 10-1

Figure 10-2

11. INSTALL DRAGLINK

a) You have two options for flipping the draglink to the top of the knuckle, 1) Ream

the tapered hole from the top if you have the correct tie rod end reamer (1 ½” per
ft) or 2) Purchase the tie rod flip adapter (800102-01) and drill the steering arm to
a 13/16” straight hole.

b) Using the tapered reamer and a hand drill, ream the factory steering knuckle from

the top to a diameter of .750”, measured to the large end (top) of the taper.