Synergy 8024-30/8024-40 - JK Synergy Stage 4 Long Arm System User Manual
Page 23
Advertising
20.
INSTALL UPPER CONTROL ARMS
a) Preset the length of the upper control arms to 26 3/8”. The final length will be
determined when the jeep is sitting on the springs and tires to get the pinion at the
correct angle.
b) Install the new control arms with the bend inward toward the frame. The bend is
for tire clearance. The adjustable end goes at the frame end and the fixed end
Joint goes at the axle end with the pinch bolt and grease zerk on the bottom.
Reuse the factory mounting bolt at the axle end with the new 9/16 bolt at the
frame bracket.
Advertising
This manual is related to the following products: