JLG 3246E2 ANSI Service Manual User Manual

Page 35

Advertising
background image

SECTION 2 - PROCEDURES

3120737

– JLG Lift –

2-21

21. If the housing (18) assembly has passed inspection

to this point, inspect the housing bearings/bushings
(19) and (13) and if they are captured in the housing
cavity the two thrust washers (14) and thrust bearing
(15). The bearing rollers must be firmly retained in
the bearing cages, but must rotate and orbit freely.
All rollers and thrust washers must be free of brinel-
ling and corrosion. The bushing (19) or (13) to cou-
pling shaft diameter clearance must not exceed
0.010 inch (0.025 mm). A bearing, bushing, or thrust
washer that does not pass inspection must be
replaced. If the housing has passed this inspection
the disassembly of the Torqlink™ is completed.

NOTE: The depth or location of bearing/bushing (13) in rela-

tion to the housing wear plate surface and the depth

or location of bearing/bushing (19) in relation to the

beginning of bearing/bushing counter bore should be

measured and noted before removing the bearings/

bushings. This will facilitate the correct reassembly

of new bearings/bushings.

22. If the bearings, bushing or thrust washers must be

replaced use a suitable size bearing puller to
remove bearing/bushings (19) and (13) from hous-
ing (18) without damaging the housing. Remove
thrust washers (14) and thrust bearing (15) if they
were previously retained in the housing by bearing
(13).

Advertising