Hose Carrier Removal

1. Remove the guide bracket (11) at the front of the

hose carrier (12). Reuse the existing hardware.

2. Loosen and remove the front two mounting bolts (13)

holding the hose carrier in place. Tag all hardware.

3. Remove the hose carrier through the front of the

fourth boom section.

4. When the hose carrier is approximately 25% free of

the fourth boom section, fasten the two hose carriers
together (using nylon tie-wraps or nylon straps) to
prevent separation.

5. Continue to remove the hose carrier, fastening the

hose carriers together as they are being removed.

6. When the hose carrier is approximately 75% tied

together, pull the assembly free of the boom section.

7. Lower the hose carrier onto a suitable support.

8. Remove the hose carrier guide bracket from the

inside of the fourth boom section (14).

3.5.5

Fourth Boom Section Assembly

1. Place fourth boom section onto suitable supports.

2. Install the previously removed extend chain

assembly and clevis (1) at the top rear of the fourth
boom section. Allow 0.250 in (6,35 mm) (C) between
the end of the clevis (1) and the face of the lock nut
(2). Torque lock nut to 100 lb-ft (135 Nm).

3. Install all wear pads, spacers and shims (3, 4 and 5)

at rear of the fourth boom section. Snug mounting
bolts. Shim as needed AFTER boom section is
installed. Refer to Section 3.9.2, “Wear Pad
Installation and Lubrication,” f
or detailed information.

MY3470

12

13

11

13

MY3610

14

FRONT OF BOOM

MY3630

C

2

1

MY3490

5

5

3

4

4

3

Advertising
This manual is related to the following products: