Boom

3-14

G10-55A, G12-55A

2. Install adjusting block (17) using existing hardware

(18). Torque as required.

3. Install chain and clevis (19), spring (20), spring stop

(21), adjusting nut and lock nut (22).

4. Allow 0.50 in (1,27 mm) (A) between the end of the

clevis (23) and the face of the lock nut (24). Torque
lock nut to 100 lb-ft (135 Nm).

5. Properly connect the batteries.

6. Retract the second boom section pulling both retract

chains at the same time.

7. Install the wear pad, support plates and spacers (25)

with existing hardware at the inside top front of the
second boom section. Snug mounting bolts. Shim as
needed AFTER boom section is installed. Refer to
Section 3.9.2, “Wear Pad Installation and
Lubrication,” f
or detailed information.

.

8. Install the wear pad support plate (27) with existing

hardware at inside front of second boom section.

Note: Longer bolts (30) may be required to fully engage
threaded inserts in the wear pads without allowing bolts
to protrude past the chamfer on the wear pads. Refer to
Section 3.9.2, “Wear Pad Installation and Lubrication.”

9. Install wear pads, spacers and shims on each side

and bottom (26, 28 and 29) at front of second boom
section. Snug mounting bolts. Shim as needed
AFTER boom section is installed. Refer to Section
3.9.2, “Wear Pad Installation and Lubrication,”
for
detailed information.

10. Manually retract the boom sections as required to

connect the retract chains.

11. Install bracket and clevis assembly (31) at rear of

fourth boom section. Torque mounting bolts.

MY3540

18

17

19

18

21

22

20

A

MY3650

24

23

25

25

26

26

MY3450

28

29

30

30

29

28

27

MY3590

31

Advertising
This manual is related to the following products: