Xit6000-ca, Maintenance, 3/8” tie-lok – BAND-IT XIT 6000-CA 3/8 Tie-Lok Tool User Manual

Page 27: Tool

Advertising
background image

Document # XIT177 Rev E

© Copyright

BAND-IT-IDEX, Inc. 2005

All rights reserved

www.BAND-IT-IDEX.com

BAND-IT-IDEX, Inc.

A Unit of IDEX Corporation

4799 Dahlia Street Denver, CO 80216-3070 USA

P: 1-800-525-0758 F: 1-800-624-3925

27

XIT6000-CA

3/8” Tie-Lok

®

Tool

4) Lubricate the removed cover as shown with red arrows above. Also,

lubricate the tool body, linkage and Tension Block Assembly as shown on page 28.

5) Inspect all mechanical linkage for lubrication, proper placement and refit cover.

6) Secure the tool side cover by inserting and tensioning (2) #10 – 32 X 4”

length cap screws through the Cylinder Housing and into the Cover. Apply
a light dab of red Loctite thread loc to one or two threads to prevent loosening during
operation.

Maintenance

Advertising